[CLIS logo]

LBSC 790/INFM 718B
Building the Human - Computer Interface
Fall 2004
Prototype 2/Specification 3


The specification for the next iteration of the project should contain the same information as Specification 1.

The frozen prototype should contain the same information as Prototype 1

The frozen prototype and the specification for the next iteration should be turned in by creating a Web page that links to each required item, linking to that page from your project Web page, and then sending the professor and a TA an email stating that it is there before the beginning of class on the date that it is due. No changes may be made to the page for the specification or to anything linked from that page after that email is sent.


Doug Oard
Last modified: Fri Aug 20 21:52:17 2004